1. <wbr id="mwwu0"><menu id="mwwu0"><abbr id="mwwu0"></abbr></menu></wbr><pre id="mwwu0"></pre>
        <thead id="mwwu0"><rt id="mwwu0"><noscript id="mwwu0"></noscript></rt></thead>
        <p id="mwwu0"><li id="mwwu0"></li></p>
          亚洲一区二区三区蜜桃臀,国产午夜精品理论大片,高清色本在线www,国产精品久久777777,亚洲成a人v欧美综合天堂下载 ,国产亚洲精品综合99久久,日韩av综合免费在线,狠狠色综合久久狠狠色综合

          About us

          Guangzhou yue kang sports engineering co., LTD

           

          Office Address: Guangzhou, Guangdong
          Postcode: 511495
          Tel: 400 185 1727
          Contact: Mr. Liu

          Your location:Home >Scheme > Basketball court laying solution
          scheme

          Basketball court laying solution

          date posted:2016-12-01

          3


          Range of use:

          Indoor and outdoor tennis court, silicon PU volleyball court, silicon PU basketball court, badminton court and other venues.

          Construction scheme of cement based on silicon PU Stadium

          First, the basic treatment of cement

          A, ground grinding, clean up the ground.

          B, repair damage foundation.

          C, primer: basic enough after drying with special primer coating on the base surface, the principle to form a bright film after brushing the surface, lack of coating must be sufficient to date, (bottom coating effect to penetrate into the base of micro hole, after curing blockage and reinforcement of underground water and gas surface; bright film is formed ensure the foundation of micro holes completely blocked), should be avoided in the sun or the foundation of high temperature circumstance (>450C) construction to ensure the bottom paint permeability (no fog rain weather in the morning or evening suitable). Based on the surface strength of <C20 or surface loose, available primer and 1 times diluted mixture is coated on the surface of thick (enhanced permeability, increase the depth of penetration) formed bright film surface until now, the surface of the base to meet construction requirements.

          D, filling: coating after curing, the direct use of elastic material to fill the joints with portable grinder polished, and elastic material in two or more of the "V" type slot fill (a fill thickness of not more than 1.0mm thick foam, affect the performance of the sealant). (as shown in figure (2))

          E, leveling, repair: local water circle in the pickling process, water with not more than 5mm with elastic layer and surface layer of special sand according to 1:1 (weight ratio), plus the amount of diluent mixing and adjusted to suitable for the construction of consistency, using a ruler or scraper scraping leveling water; if the water depth more than 5mm, the application of elastic material in the thin coating of stagnant water, and then the elastic material with 40~80 mesh sand according to 1:6~8 (weight ratio) mixing evenly, smooth water in paving and compaction, thin coating (elastic material function to ensure the bonding repair material and base firmly; if the sand grain is fine with >80 eyes. The amount should be reduced accordingly) repair attention when trimming don't let the repaired side higher base, if there are higher in after curing, polishing, elastic layer construction can be carried out.

          Foundation treatment:

          A, to eradicate the original asphalt base.

          B, re paving cement mixed soil.

          C, water leveling repair: according to the new requirements of cement based processing.

          Two, silicon PU material construction

          Here, a basic surface cleaning:

          1, clean and with water wet surface, and then coated with dilute hydrochloric acid is about 5% and scrub;

          2, clean the dust high pressure field.

          Here, two base expansion joints and cracks:

          1, the expansion joint and the crack mouth construction into V type (an inverted horn shape);

          2, thoroughly clean the inside and remove the slot wall sediments, dirt, grease etc..

          Here, three basic waterproof primer Construction: more than 0.2KG/m2

          Waterproof primer for single component materials, with a roll coating method directly based on the dry cement penetration after construction; theory of material dosage of 0.2kg/m2, according to the rough degree of cement base surface, the amount of material will change. Shall be fully covered (including expansion joints and cracks in the wall), adhesive curing shall be 24 hours, 24 hours after the next process of construction.

          Here, four foundation joints, cracks and low-lying water repair:

          1, after strictly regulate the treatment based on expansion joints, cracks qualified, using silicon elastomer buffer material PU course according to the weight ratio of adding 5% purified water directly after high speed stirring to fill a flat.

          2, repair the site water, can use D68 emulsion product scraping and coating repair level.

          Here, five principal elastic construction: more than or equal to 6KG/m2, three layer construction

          The construction of the elastic layer: before construction according to the weight ratio of 1-3% (according to the construction of environmental temperature and humidity adjustment) add water purifying high speed stirring and instant fast construction; the construction of a smooth toothed trowel.

          Construction: six, wear resistant finish surface layer: more than 0.2KG/m2, the construction of roller coating or coating layer not less than two

          Silicon PU water-based paint is a two-component materials, must be in the correct proportion of provisions in the construction (topcoat: crosslinking agent =14:1, and the ratio of no uneven stirring performance will reduce the use of surface layer and the bottom adhesion) two components are fully and quickly use the instant high speed stirring. The construction method is limited to the way of rolling and coating or spraying, and the roller is used to change the direction of roller. Finish the construction temperature is lower than 5 DEG C is not suitable for construction, 10 hours after the construction of anhydrous immersion.

          Case seven and site 72 hours after the completion of cleaning, maintenance can be put into use.

          This guide only for the use of silicon PU materials to provide guidance in the nature of the site construction of some of the details of the site should be properly handled according to the situation.

          Key words:Basketball court laying solution
          分享到:
          Previous:Swimming pool construction Next:No Next
          主站蜘蛛池模板: 久久无码专区| 成人亚欧欧美激情在线观看| 色综亚洲国产vv在线观看| 亚洲国产无线乱码在线观看| av在线播放国产一区| 好吊视频一区二区三区人妖| 蜜臀久久99精品久久久久久酒店| 中文字幕av国产精品| 丰满少妇熟乱xxxxx视频| 无码人妻精品中文字幕免费时间| 精品无码一区二区三区小说 | 欧洲亚洲色视频综合在线| 香港日本三级亚洲三级| 窝窝午夜看片国产精品| 一本色道久久综合狠狠躁| 成在人线av无码免费高潮水老板| 内射影院| 中文字幕亚洲人妻| 精品人妻无码专区在线无广告视频视频在线 | 亚洲熟女乱色综合亚洲| 好爽受不了了要高潮了av| 国产精品中文字幕一区| 亚洲成人综合社区| 日韩,中文,变态,人妻| 国自产拍偷拍精品啪啪| 亚洲国产精品久久久久秋霞| jizz国产| 国产精品成人亚洲| 69堂人成无码免费视频果冻传媒| 在线看高清中文字幕一区| 成人免费看黄网站yyy456| 性无码视频在线播放| 亚洲午夜精品一级在线| 蜜臀av日韩精品一区二区| 国产成人精品一区二区不卡| 中文字幕有码高清日韩| 8X成年视频在线观看| 亚洲精品中文字幕一二三| 99热视屏| 亚洲欧洲国产一区| 久久婷婷五月综合97色一本一本|